TDA Property Services produced the initial concept through an assessment and designed a replacement system. The team tendered the package and sought the most cost effective contractor to comprehensively deliver the install. TDA continued to manage the project throughout installation up until completion.

The works included:

  • replacement of the existing gas-fired boilers with new high efficiency gas boilers, complete with new flue system
  • replacement of the existing chiller compressors and wet cooling towers and associated pipe work with new roof mounted screw chiller compressors
  • roof-mounted air condensers and pipe work, including a heat recovery unit
  • replacement of the swimming pool air handling unit
  • a new building management system

 

All works were carried out with no impact on the day-to-day operation of the centre. The replacement system ensures the facility is more energy efficient, with reduced consumption